esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
56 results for “
"VFD"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
Corpus: 1990-03-17 – 2025-12-01
←
August 2016
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Undated
(150,429)
None
Light
Medium
Heavy
EFTA02454673
Dataset 11
2016-08-24
4p
578w
Subject:
Fwd: RO plant parts LS)
From:
Richard Kahn a>
To:
Ann Rodriquez
…Kahn, I apologize in advance for the process you h=ve had to undergo related to acquiring the parts necessary for repairs to y=ur RO plant. Your invoice contained two parts, one being a Siemens power supply and the other a Danfoss
VFD
drive. W= have the Siemens power supply in hand. The Danfoss drive part is mad= to order in Denmark and there is no expedite option when ordering this par=. 2 EFTA_R1_01556589 EFTA02454674 At the time we…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02454673.pdf
EFTA01004097
Dataset 9
2018-08-02
2p
283w
Subject:
Fwd: ZM VD Well B
From:
Brice Gordon
To:
"jeffrey E." <
[email protected]
>
…B Date: Thu, 02 Aug 2018 18:47:03 +0000 Attachments: ZM_VD_Well_B.pdf; ZM_Well_B_2015_Prop.pdf Good Afternoon attached for your review The Existing
VFD
which drives the Well Pump at Well B is Failing Original Cost: 14002.00 with Enclosure The New unit is larger in capacity 25Hp vs the Existing 7.5 HP Installed Cost with Support $13589.00 This solution is an Engineered by Matt 'eremitic), Betatron, contact Can we proceed…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01004097.pdf
EFTA00655517
Dataset 9
2018-06-18
1p
257w
…Exhaust system installation, completed the wiring for both kitchen
VFD
's waiting for mechanical technologies to send start up technician to program units to operate both kitchen hood exhausts. • Con Edison steam shutdown for 9 East 71" street from Friday June 21" to Tuesday June 25th 8:00am sent E-Mail showing hot water service interruption and room temperature control issues during shutdown. • Emergency Hot Water Backup system working on electrical contactors and controls found contactors beyond repair, need replacement…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00655517.pdf
EFTA00583409
Dataset 9
2018-06-18
1p
257w
…Exhaust system installation, completed the wiring for both kitchen
VFD
's waiting for mechanical technologies to send start up technician to program units to operate both kitchen hood exhausts. • Con Edison steam shutdown for 9 East 71" street from Friday June 21" to Tuesday June 25th 8:00am sent E-Mail showing hot water service interruption and room temperature control issues during shutdown. • Emergency Hot Water Backup system working on electrical contactors and controls found contactors beyond repair, need replacement…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00583409.pdf
EFTA00956071
Dataset 9
2013-03-15
3p
592w
Subject:
Re: 71st Street - Chiller/Tower Proposal
From:
Jeffrey Epstein <
[email protected]
>
To:
Richard Kahn
…ADW Bid was the installation of a
VFD
(variable frequency drive) which varies the speed of the fans on the cooling tower as compared to standard feature of High Low and Off. Currently we do not have a
VFD
and ADW said the payback period of energy savings would be approximately 10 years. The cost for this extra is 22,656. Please advise if ok to proceed with AD Winston. Option 1 - ADW and no
VFD
350,000 - 116,666…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00956071.pdf
EFTA01144588
Dataset 9
2012-06-19
2p
422w
…warranty on entire project. 4• Five-year warranty on new compressors (Part only) + All labor and supervision to complete the above scope of work. Price: $357,255.00 Three Hundred Fifty Seven Thousand Two Hundred Fifty Five Dollars (plus applicable sales tax) Price valid for 30 days. EFTA01144588 Add/Alternate: Please add $22,656.00 Twenty Two Thousand Six Hundred Fifty Six Dollars to the above price for the installation of (2)
VFD
's to control the cooling tower fans…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01144588.pdf
EFTA01454604
Dataset 10
1p
254w
…and Air Retrofit of CRAC with
VFD
and controls 1 375,804 Conditioning Upgrades Electric Motors and Drives AHU
VFD
Retrofit 1 583,697 Water and Sewer EcoLab Conveyer Dishwasher (3) 3 28,602 313 Conservation Systems RCx Optimization - Chiller Plant RCx Optimization - Exhaust Systems RCx Optimization - Filter Optimization RCx Optimization - Heating Plant Commissioning 19 5,175,722 1,525 RCx Optimization — Humidification (3) RCx Rescheduling - HVAC System (4) RCx Rescheduling — Lighting (2) RCx Rescheduling — Temperature (6) Totals 24 6…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01454604.pdf
EFTA02020798
Dataset 10
2011-09-23
1p
187w
Subject:
RE: Siemens
…work is complete . The only work left is the off site connection with apogee go , to control the BMS over the static ip address. We also found a problem with the Catering Kitchen exhaust fan which we will need to up grade the
VFD
drive to resolve operational problems from the range hood . I had siemens look at the system specifications to give a price for replacement. I will call you Monday to go over the additional work. Richard. >…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02020798.pdf
EFTA01853151
Dataset 10
2011-10-11
4p
386w
Subject:
RE: ABB Drives
From:
Richard Bamett
To:
rich
To: rich kahn ; Jeffrey Epsteinueevacatton©gmail.comj From: Richard Bamett Sent Tue 10/11/2011 6:57:39 PM Subject FW: ABB Drives 0540 001.odf Hi Rich attached is the proposal for two
VFD
drives that are needed at 71st street .The 1st one for Catering Kitchen exhaust fan For$468.00 +frt+ 300.00 start up =$768.00 +fn. The second drive is for house reheat system back up pump $419.00 +$300.00 start up=$719.00 +frt. Total cost…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01853151.pdf
EFTA02008884
Dataset 10
2011-10-04
2p
473w
Subject:
FW: Siemens upgrade
From:
Richard Bamett
To:
jeevacation©gmail.comfjeeyacation©gmail.comj: Jeffrey Epsteinheeyacationsfpgmail.coml
To: jeevacation©gmail.comfjeeyacation©gmail.comj: Jeffrey Epsteinheeyacationsfpgmail.coml From: Richard Bamett Sent Mon 10/10/2011 6:46:18 PM Subject: FW: Siemens upgrade Mr. Epstein this is Siemens response to a phone message i sent to complete the remote dial in feature to complete the project 100%lland to give a price to change the
VFD
for the catering kitchen exhaust . I sent to Rich Kahn this e mail Rich Kahn wants to have a conference call on tuesday oct…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02008884.pdf
EFTA01853326
Dataset 10
2011-10-11
4p
519w
Subject:
RE: ABB Drives
From:
Jeffrey Epstein
To:
Richard Bamett
…Oct 11, 2011 at 2:57 PM, Richard Barnett a wrote: Hi Rich attached is the proposal for two
VFD
drives that are needed at 71st street .The 1st one for Catering Kitchen exhaust fan For$468.00 +frt+ 300.00 start up 4768.00 +frt. The second drive is for house reheat system back up pump $419.00 +$300.00 start up=$719.00 +frt. Total cost of project for both drives is $1.487.00 +frt Shipping should be less…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01853326.pdf
EFTA01454629
Dataset 10
1p
255w
…and Air Retrofit of CRAC with
VFD
and controls 1 375,804 Conditioning Upgrades Electric Motors and Drives AHU
VFD
Retrofit 1 583,697 Water and Sewer EcoLab Conveyer Dishwasher (3) 3 28,602 313 Conservation Systems RCx Optimization - Chiller Plant RCx Optimization - Exhaust Systems RCx Optimization - Filter Optimization RCx Optimization - Heating Plant Commissioning 19 5,175,722 1,525 RCx Optimization — Humidification (3) RCx Rescheduling - HVAC System (4) RCx Rescheduling — Lighting (2) RCx Rescheduling — Temperature (6) Totals 24 6…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01454629.pdf
EFTA00956077
Dataset 9
2013-03-15
3p
594w
Subject:
Re: 71st Street - Chiller/Tower Proposal
From:
Jeffrey Epstein <
[email protected]
>
To:
Richard Kahn
…ADW Bid was the installation of a
VFD
(variable frequency drive) which varies the speed of the fans on the cooling tower as compared to standard feature of High Low and Off. Currently we do not have a
VFD
and ADW said the payback period of energy savings would be approximately 10 years. The cost for this extra is 22,656. Please advise if ok to proceed with AD Winston. Option 1 - ADW and no
VFD
350,000 - 116,666…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00956077.pdf
EFTA01223584
Dataset 9
2018-12-02
6p
854w
…Electric Invoice PO Box 10645 Albuquerque, NM 87184-0645 Date Invoice # 11/29/2018 39x Bill To Ship To Zorro Ranch 49 Zone Ranch RD Stanley NM 87056 n.Number Terms Rep Ship Via F0B Project 11/29/2018 Quantity Item Code Description Price Each Amount This ABS 3 Phase
VFD
it comes Irrigation design package. It is a Factory pre wired package in its own Nemo 3R inclosurc ready to install and program. This unit will take care of…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01223584.pdf
EFTA01019176
Dataset 9
2018-10-19
1p
294w
Subject:
Re: LSJ RO Sea Water Intake Pumps Replacement
From:
J <
[email protected]
>
To:
Brice
…plant was installed, hence 4 pumps. The Existing Intake System requires only one pump to supply the 90k SWRO Plant The Expanded SWRO Plant will require 2 of the 4 pumps. At this time 2 of the 4 pumps/motors and the priming pump/motor need replacing, therefore we have no redundancy. The attached proposal is for 2 x 15hp motors with S/S fluid ends with
VFD
's and Priming Station, I pump to supply SWRO, I as a…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01019176.pdf
EFTA01019179
Dataset 9
2018-10-19
1p
206w
Subject:
LSJ RO Sea Water Intake Pumps Replacement
From:
Nice gordon •tta
To:
J <
[email protected]
>
…plant was installed, hence 4 pumps. The Existing Intake System requires only one pump to supply the 90k SWRO Plant The Expanded SWRO Plant will require 2 of the 4 pumps. At this time 2 of the 4 pumps/motors and the priming pump/motor need replacing, therefore we have no redundancy. The attached proposal is for 2 x 15hp motors with S/S fluid ends with
VFD
's and Priming Station, I pump to supply SWRO, 1 as a…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01019179.pdf
EFTA01091903
Dataset 9
2012-08-15
2p
309w
…and chillers -Furnish labor and material for removal and replacement of the Sand Filter Media Our price to perform this work with union labor during normal working hours is: Three Hundred Thirty Thousand Dollars $330,000 Add /Alternate for
VFD
's on the BAC Tower Fans $8,200 Exclusions/Clarifications: -Power Wiring -Overtime -Firestopping -Rerouting existing services not shown -Asbestos conditions -Fire Alarm Work -Insulate existing ductwork -Work on existing Condenser/Chilled water pumps -Maintenance Contract -Leak testing or sealing…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01091903.pdf
EFTA01454627
Dataset 10
1p
390w
…Cafeteria Appliances (4) following projects not yet 5 130,815 544 reductions Plug Load - Vendormiser completed: BAS Automated demand response replacement, Chilled Water Other 2 2.376 Tenant awareness - Earthhour Pump
VFD
and FIX Upgrade, 70 18,789,698 57,968 and (4) lighting 2007 Baseline2 92,550,623 Percent of Baseline 20.30% improvements. See footnote I on page 41. Project Data records arid energy & wale' savings provided by CRES year ending 2012. Savings calculation validated by third party…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01454627.pdf
EFTA02707514
Dataset 11
2013-02-28
2p
430w
…Five-year warranty on new compressors (Part only) ❖ All labor and supervision to complete the above scope of work. Price: $352,255.00 Three Hundred Fifty Two Thousand Two Hundred Fifty Five Dollars (plus applicable sales tax) Price valid for 30 days. 1 EFTA_R1_02105576 EFTA02707514 Add/Alternate: Please add $22,656.00 Twenty Two Thousand Six Hundred Fifty Six Dollars to the above price for the installation of (2)
VFD
's to control the cooling tower fans…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02707514.pdf
EFTA00621939
Dataset 9
2010-12-09
3p
3,654w
…Controllable points: temperature settings, automated approaches c. Modes of operation based on occupancy d. Humidity Control e. Other possible HVAC improvements (DCV, OA economizer,
VFD
's) 3. Lighting system improvements (retrofits of advanced lighting technologies) 4. Specific energy procurement strategies 5. Investigate NYSERDA and ConEd Energy rebate incentives. 6. An ENERGY STAR benchmarking profile will be created Investment: $9,863.00: (Nine Thousand Eight Hundred Sixty Three Dollars) Plus Tax ri Wiring by Siemens. Inc. ❑ Wiring by others ri…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00621939.pdf
1–20 of 56 results · page 1 of 3
«
←
1
2
3
→
»
Results by Dataset
56 total
Set 9
36
Set 10
12
Set 11
8