…Unit Cost - $43,170.00 5/8/13 - Revised quote forwarded to RK, awaiting direction Ducting - TBA Repair Pool/Spa (29) - $12,600.00 5/9/13 - Vendor on site 5/16/13 - Bid breakdown forwarded to RK Water Sample of Tap Water - 4/27/13 - JE requested water samples be taken. This will be completed once water system is balanced 5/10/13 - Dakota RO is down, pressure issues 5/26/13 - Water samples to be taken Exterior Doors - …
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124776.pdf
EFTA01124648Dataset 9
2013-06-229p2,004w
…completed camera inspection, awaiti ng report/disc. 6/21/13 - Report/Disc forwarded to Beaudin Ganze, awaiti ng review . . Repair Pool/Spa (29) - Start End Total Est. Cost Notes Photo $12,600.00 5/9/13 - Vendor on site 5/16/13 - Bid breakdown forwarded to RK JE requested work be completed in Sept Water Sample of Tap Water - Start , End Total Est. Cost Notes 6/12/13 Photo 4/27/13 - JE requested water samples be taken. This will…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124648.pdf
EFTA01124782Dataset 9
2013-05-257p1,664w
…who requested more detail Unit Cost - $43,170.00 5/8/13 - Revised quote forwarded to RK, awaiting direction Ducting - TBA 5/22/13 - Beaudin Ganze on site to review project 5/30/13 - Beaudin Ganze estimate due EFTA01124783 Zorro Projects - 5/25/13 Repair Pool/Spa (29) - i Start End Total Est. Cost I Notes Photo $12,600.00 5/9/13 - Vendor on site 5/16/13 - Bid breakdown forwarded to RK JE requested work be completed in…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124782.pdf
EFTA01124639Dataset 9
2013-06-159p2,031w
…JBH forwarded estimate 6/4/13 -JE approved moving ahead 6/11/13 - JBH due on site 6/12/13 - JBH on site, completed camera inspection, awaiting report Repair Pool/spa (29) - Start End Total Est. Cost Notes Photo $12,600.00 5/9/13 - Vendor on site 5/16/13 - Bid breakdown forwarded to RK IF requested work.be completedan Sept REQUIRE CONFIRMATION THAT BID IS ACCEPTED, SO VENDOR CAN BE PLACED INTO SCHEDULE Water Sample of Tap Water - …
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124639.pdf
EFTA01124677Dataset 9
2013-07-2710p2,281w
…report 7/8/13 - Report due 7/9/13 - Informed that report has been delayed 7/12/13 - Report due 7/18/13, report forwarded, awaiting direction EFTA01124679 Zorro Projects - 7/27/13 Repair Pool/Spa (29) - Start End Total Est. Cost Notes Photo $12,600.00 5/9/13 - Vendor on site 5/16/13 - Bid breakdown forwarded to RK JE requested work be completed In Sept Kitchen Table Electrical - (35) - Three B's Start End Total Est. Cost …
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124677.pdf
EFTA01124657Dataset 9
2013-06-299p2,231w
…completed camera inspection, awaiti ng report/disc. 6/21/13 - Report/Disc forwarded to Beaudin Ganze, awaiti ng report 7/8/13 - Report due 7/8/13 Repair Pool/Spa (29) - Start End Total Est. Cost Notes $12,600.00 5/9/13 - Vendor on site Photo 5/16/13 - Bid breakdown forwarded to RK iJE requested work be completed in Sept EFTA01124659 Zorro Projects - 6/29/13 Water Sample of Tap Water- Start c End Total Est. Cost Notes…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124657.pdf