esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
7 results for “
"Priming System"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
EFTA00621616
Dataset 9
2017-06-29
14p
2,763w
…and reinstalled. Intake Pumps and
Priming System
EFTA00621618 -Nor TSG MAKING EVERY DROP COUNT Page 4 of 14 Intake Pumps Figure 1: Intake Pumps Observations As noted previously, this system was originally installed in 2007 and expanded in 2011 for the larger plant. The expansion consisted of installing new intake pumps, additional basket strainers, a new control panel, and repairs to the
priming system
. The
priming system
is vital to insuring that the intake pumps start without cavitation, which causes…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00621616.pdf
EFTA01194473
Dataset 9
2014-11-19
8p
1,619w
…4 441 / EFTA01194473 ilk ..... TSG MAKING EVERY DROP COUNT Page 2 of 8 Table of Contents Introduction 3 Plant Observations and Recommendations 3 Intake Structure 3 Intake Pumps and
Priming System
3 Media Filters 5 Energy Recovery Pressure Exchangers and Boost Pump 5 High Pressure Pump and Motor 6 Membranes and Vessels 7 Post Treatment System 7 Overall Plant 8 Summary 8 EFTA01194474 4,1 TSG -ge- MAKING EVERY DROP COUNT Page 3 of 8 Introduction On November 19, 2014…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01194473.pdf
EFTA00802922
Dataset 9
2016-02-19
5p
1,849w
Subject:
Water Supply Options for Great St. James Island
…Depending on the location of the container, a small concrete pad or vault would need to be built near the shoreline and would house a seawater intake pump and
priming system
that would provide raw seawater to the plant. We would assume a 200 ft long intake pipe of 4-inch diameter would be needed and the intake pump and container would be no more than 500 feet apart and at roughly the same elevation. A temporary "bladder tank" of…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00802922.pdf
EFTA00610775
Dataset 9
2016-02-19
5p
1,810w
Subject:
Water Supply Options for Great St. James Island
…Depending on the location of the container, a small concrete pad or vault would need to be built near the shoreline and would house a seawater intake pump and
priming system
that would provide raw seawater to the plant. We would assume a 200 ft long intake pipe of 4-inch diameter would be needed and the intake pump and container would be no more than 500 feet apart and at roughly the same elevation. A temporary "bladder tank" of…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00610775.pdf
EFTA00804962
Dataset 9
2018-10-15
12p
3,944w
…intake pumping been sized to meet the current feedwater and pressure system. The proposed seawater supply system has well as those for the proposed expanded plant capacity requirements of the current desalination system as of 140,000 gallons per day (GPD). rs, new PVC piping,
priming system
, and two The upgrades pump station will consist of four basket straine requirements of the desalination plant. Each pump intake pumps, each sized to meet the flow and pressure controlled by the main…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00804962.pdf
EFTA00807650
Dataset 9
2018-06-30
28p
7,027w
…0 5.9 8.2 To meet the flow and pressure requirements of the system pretreatment, an intake pump, intake
priming system
and related piping will be provided and installed in a shelter (provided by The Saint James Group). The scope of supply includes the following: Intake Pump Number provided 1 CEMT.N.T. SEAWATER SYSTEM ISO PACE 7 OF RS EFTA00807656 Manufacturer Ampco Model ZC2 2" x 1.5" Pump Fluid End 2205 Duplex Stainless Steel Motor Rating, HP …
https://www.justice.gov/epstein/files/DataSet%209/EFTA00807650.pdf
EFTA01109916
Dataset 9
2014-02-18
9p
1,449w
…that LSJ has all necessary information so that the SWRO plant can be brought back to its original operational condition. This evaluation would include; Critical spares list needed to be purchased and stored onsite for future issues that may occur with the SWRO plant. The condition of the SW intake pumps,
priming system
, and SW intake pipe. The High Pressure pump running condition including both power and fluid sides of the HP pump. Booster Pump liquid end, PX pressure exchangers…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01109916.pdf
Corpus: 1990-03-17 – 2025-12-01
←
June 2017
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Undated
(150,429)
None
Light
Medium
Heavy
Results by Dataset
7 total
Set 9
7