esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
23 results for “
"Multi Stack"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
Corpus: 1990-03-17 – 2025-12-01
←
July 2012
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Undated
(150,429)
None
Light
Medium
Heavy
EFTA00659364
Dataset 9
2012-07-10
2p
214w
Subject:
Fwd:
Multi-Stack
chiller/New Cooling Towers
From:
Richard Kahn
To:
Jeffrey Epstein <:
[email protected]
>
From: Richard Kahn To: Jeffrey Epstein <:
[email protected]
> Subject: Fwd:
Multi-Stack
chiller/New Cooling Towers Date: Tue, 10 Jul 2012 18:13:34 +0000 are you free to speak? i have requested further breakdowns of figures below to breakout materials vs labor PLEASE NOTE EFFECTIVE JUNE 5TH MY CONTACT INFO WILL BE AS FOLLOWS: Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor, New York, New York 10022 tel fax cell Begin forwarded message: From: Richard…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00659364.pdf
EFTA00583542
Dataset 9
2013-07-01
2p
535w
9 East 71" street Daily Report 7/01/13 & 7/02/13 • 7/1Shutdown
Multi Stack
Chiller #2 removed condenser screens cleaned with a wire brush in c —level slop sink replaced screens put
Multi Stack
back on line turned old Carrier Chiller off. Refrigerant pressure back to normal. • 7/1 Worked on Main fire pump shaft seal , leaking badly cleaned up seal tightened packing gland. • 7/1Nalco Chemical at 71g checking all water treatment levels added corrosion inhibitor to…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00583542.pdf
EFTA01091903
Dataset 9
2012-08-15
2p
309w
…Carrier Chiller, BAC Roof Top Cooling Tower and Remote Sump -Reclamation of Freon in Carrier Chiller -Rig 2- New BAC Tower 524
Multi-Stack
Chiller BAC Remote Sump X702 -Furnish and install all Condenser and Chilled Water piping associated with the Cooling Towers. Remote Sump and
Multi-Stack
Chillers -Replacing existing Isolation Valve Actuators on Condenser and Chilled Water piping -Insulation of Condenser and Chilled Water Piping -Balancing of Condenser and Chilled Water -Start-up of cooling towers, and chillers…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01091903.pdf
EFTA01733626
Dataset 10
53p
9,767w
…out and temperature pressure. 2. Check condenser water in, out and temperature pressure. 3. Check refrigerant pressure, high/suction. Weekly Schedule I. Check oil level compression. 2. Check refrigerant charge. Monthly Schedule I. Clean
multi-stack
, condenser high efficiency strainer. Quarterly Schedule I. Check tightness of electrical connections. 2. Check compression unloaders. 3. Check flow switched and safety circuits. 4. Perform refrigerant leak tests. 5. Check high pressure relief valve. 6. Check thermostatic expansive valve (TXV). 'The Information contained in…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01733626.pdf
EFTA01875576
Dataset 10
2012-07-31
1p
60w
From:
Richard Kahn
To:
Jeffrey
[email protected]
]
To: Jeffrey
[email protected]
] From: Richard Kahn Sent Tue 7/31/2012 2:08:52 PM Subject Re: 71st Street
Multi-Stack
chiller/New Cooling Towers Mervyn has Pierpont Mechanical coming to the house today between 3 and 4pm. to see equipment and prepare a bid for work PLEASE NOTE EFFECTIVE JUNE 5TH MY CONTACT INFO WILL BE AS FOLLOWS: Richard Kahn HBRK Associates Inc. EFTA_R1_00284215 EFTA01875576
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01875576.pdf
EFTA01092129
Dataset 9
1p
414w
…Island City New York 1 1 101 vvww.adwinstonservice.com servile G' 04.02.13 Dear Mr. Barnett, In receipt of your request to cancel the
multi stack
chiller, we are currently waiting to hear from the factory, to see if any charges will be incurred from cancellation. However, let me point out the following benefits for proceeding with this project: The existing
multi stack
chiller consists of 4 compressors, which operates on demand to maintain desired chilled water temperature…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01092129.pdf
EFTA01969010
Dataset 10
2013-07-05
1p
220w
Subject:
RE:
From:
Richard Bamett
To:
Jeffrey Epsteinfleevacationflegmail.comj
…project will take 2 to 3 weeks to complete . We will have no A/C at all at least 2 weeks . I am keeping the old 40 ton Carrier for a emergency back up which we can run until the
multi stack
chiller is installed this will save a week of down time so we can run about 60% of the house after 2 weeks. Michael Palladino will provide a full installation schedule on Monday July 8th. Richard Date: Fri…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01969010.pdf
EFTA01875416
Dataset 10
2012-07-11
3p
267w
Subject:
Fwd: contact info
From:
Richard Kahn
To:
Je vacationfieevacation©gmail.com]
… (2) BAC Model # VTO-052-J (1)
Multi Stack
Chiller module model # MS030CC1A2W2AA-407c Break Down Cooling Towers $80,000.00 Cooling Tower Indoor Sump $15,000.00 EFTA_R1_00283980 EFTA01875416 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00
Multi Stack
Chiller $55,890.00 Chiller piping material $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01875416.pdf
EFTA01897020
Dataset 10
2012-07-12
4p
388w
Subject:
Re: contact info
From:
Jeffrey Epstein
To:
Richard Kahn
… (2) BAC Model # VTO-052-J (1)
Multi Stack
Chiller module model # MS030CC1A2W2AA-407c Break Down Cooling Towers $80,000.00 EFTA_R1_00322565 EFTA01897020 Cooling Tower Indoor Sump $15,000.00 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00
Multi Stack
Chiller $55,890.00 Chiller piping material $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01897020.pdf
EFTA02010627
Dataset 10
2013-04-02
1p
96w
Subject:
FW: Revised proposal and letter
To:
jeevacation©gmail.com[
[email protected]
]; Jeffrey Epsteinheevacationftmail.cornt
…Residence, Tower Quote.pdf Mr. Epstein attached is the revised proposal for the cooling tower only , removing the
Multi Stack
chiller from the project as you requested and also a letter from AD Winston. From: To: Subject: Revised proposal and letter Date: Tue, 2 Apr 2013 14:32:56 -0400 Hi Richard, As per your request, attached please find our revised proposal and chiller letter. Thank You, Michael Palladino Vice President A.D Winston Service Inc EFTA_R1_00511922 EFTA02010627
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02010627.pdf
EFTA01896605
Dataset 10
2012-07-11
3p
268w
Subject:
Fwd: contact info
From:
Richard Kahn
To:
Jeffrey EpsteinBeeyacation©gmail.corn]
… (2) BAC Model # VTO-052-J (1)
Multi Stack
Chiller module model # MS030CC1A2W2AA-407c Break Down Cooling Towers $80,000.00 Cooling Tower Indoor Sump $15,000.00 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00
Multi Stack
Chiller EFTA_R1_00321721 EFTA01896605 $55,890.00 Chiller piping material $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01896605.pdf
EFTA02699861
Dataset 11
2012-07-12
3p
306w
Subject:
Fwd: contact info
From:
Richard Kahn
To:
Je vacation
… (2) BAC Model # V1-O-052-J (1)
Multi Stack
Chiller module model # =S030CC1A2W2AA-407c Break Down Cooling =owers = $80,0=0.00 Cooling Tower Indoor =ump = $15,000.00</=iv> Piping Material and Labor for piping, cooling towers, cooling tower sumps and =and filter media $77,536.00
Multi Stack
=hiller $55,890.0= Chiller piping =aterial $14,000.00 1 EFTA_R1_02063520 EFTA02699861 Chiller piping =abor = $15,663.00afont> Rigging of new cooling towers to…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02699861.pdf
EFTA00647210
Dataset 9
2012-07-12
3p
298w
Subject:
Fwd: contact info
From:
Richard Kahn
To:
Je vacation <
[email protected]
>
… (2) BAC Model # VTO-052-J (1)
Multi Stack
Chiller module model # MS030CC1A2W2AA-407c Break Down Cooling Towers $80,000.00 Cooling Tower Indoor Sump ...$15,000.00 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00
Multi Stack
Chiller EFTA00647210 $55,890.00 Chiller piping material $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones $38,880.00…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00647210.pdf
EFTA00584252
Dataset 9
2013-06-07
1p
260w
…Tirshwell e-mail requesting electrician for picture light installation to call to schedule work and send proposal for cost of installation. • Contacted Michael Palladino A.D.Winston to do Chiller efficiency report for the old carrier chiller V the new
multi stack
high efficiency chiller to see KW per hour costs of operation sent Carrier 30HK040 performance data sheet for comparison .ADW will have report early next week. • Contacted Brice Gordon to discuss Zorro cooling tower installation and system control…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00584252.pdf
EFTA01179098
Dataset 9
2012-07-12
3p
282w
Subject:
Fwd: contact info
From:
Richard Kahn
To:
Je vacation <
[email protected]
>
… (2) BAC Model # VTO-052-J (1)
Multi Stack
Chiller module model # MS030CC1A2W2AA-407c Break Down Cooling Towers $80,000.00 Cooling Tower Indoor Sump ...$15,000.00 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00
Multi Stack
Chiller EFTA01179098 $55,890.00 Chiller piping material $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones $38,880.00…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01179098.pdf
EFTA00877292
Dataset 9
2012-06-21
2p
527w
Subject:
Re:
From:
Jeffrey Epstein <
[email protected]
>
To:
Richard Barnett •cl
…2012 at 6:08 AM, Richard Barnett <1 wrote: Mr.Epstein with the extreme hot outside temperatures it was very hard to get the
multi stack
chillers to make chilled water cold enough to maintain the master bed room at 60 degf space temperature. In order to achieve that below design set point ,the supply chilled water temperature needs to be 42 f- higest 44 f .We were running at 48 f supply chilled water temperature which is normal design…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00877292.pdf
EFTA00957280
Dataset 9
2013-03-25
3p
271w
Subject:
Fwd: contact info
From:
Richard Kahn
To:
Jeffrey Epstein <
[email protected]
>
… (2) BAC Model # VTO-052-J (1)
Multi Stack
Chiller module model # MS030CCIA2W2AA-407c Break Down Cooling Towers $80,000.00 Cooling Tower Indoor Sump ...$15,000.00 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00
Multi Stack
Chiller $55,890.00 Chiller piping material EFTA00957280 $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones $38,880.00…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00957280.pdf
EFTA00957289
Dataset 9
2013-03-25
3p
394w
Subject:
Re: contact info
From:
Jeffrey Epstein <
[email protected]
>
To:
Richard Kahn
… (2) BAC Model # VTO-052-J (1)
Multi Stack
Chiller module model # MS030CC1A2W2AA-407c Break Down Cooling Towers $80,000.00 Cooling Tower Indoor Sump $15,000.00 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00 EFTA00957289
Multi Stack
Chiller $55,890.00 Chiller piping material $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones $38,880.00…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00957289.pdf
EFTA01760155
Dataset 10
2013-03-26
4p
455w
Subject:
Re: contact info
From:
Richard Kahn O.
To:
Jeffrey Epstein
… (2) BAC Model # VT0-052-1 (1)
Multi Stack
Chiller module model # =S030CC1A2W2AA-407c Break Down Cooling sowers = $80,0=0.00 Cooling Tower =ndoor =ump = $15,000.00q=iv> Piping Material and Labor for piping, cooling towers, cooling tower sumps and =and filter media $77,536.00
Multi Stack
=hiller = $55,890.0= Chiller piping =aterial = $14,000.00 Chiller piping =abor = $15,663.00<=font> Rigging of new =ooling towers to roof and removal of old…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01760155.pdf
EFTA00652505
Dataset 9
2013-03-26
3p
431w
Subject:
Re: contact info
From:
Richard Kahn <I
To:
Jeffrey Epstein
… (2) BAC Model # VTO-052-J EFTA00652505 (1)
Multi Stack
Chiller module model # MS030CC1A2W2AA-407c Break Down Cooling Towers $80,000.00 Cooling Tower Indoor Sump $15,000.00 Piping Material and Labor for piping, cooling towers, cooling tower sumps and sand filter media $77,536.00
Multi Stack
Chiller $55,890.00 Chiller piping material $14,000.00 Chiller piping labor $15,663.00 Rigging of new cooling towers to roof and removal of old ones $38,880.00…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00652505.pdf
1–20 of 23 results · page 1 of 2
«
←
1
2
→
»
Results by Dataset
23 total
Set 9
13
Set 10
9
Set 11
1