esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
39 results for “
"Library AC"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
EFTA01768568
Dataset 10
2012-06-15
1p
60w
Subject:
Library AC
From:
brice gordon
To:
Jeffrey Epstein
From: brice gordon Sent: Friday, June 15, 2012 7:58 PM To: Jeffrey Epstein Subject:
Library AC
Atlanta would like to bring down a Engineer and Evaluate library system, cost $1600.00 this does not include design can we proceed Brice Gordon little Saint James USVI Phone: --20cf307d034e02c5ee04c2883a3b-- date-last-viewed 0 date-received 1339790251 flags 8590195713 gmail-label-ids 22 2 remote-id 229663 1 EFTA_R1_00078577 EFTA01768568
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01768568.pdf
EFTA01878425
Dataset 10
2012-06-15
1p
155w
Subject:
Re:
Library AC
From:
Jeffrey Epstein
To:
brice gordon
To: brice gordon From: Jeffrey Epstein Sent Fri 6/15/2012 8:03:31 PM Subject: Re:
Library AC
pleae make sure you at my office at 430, On Fri, Jun 15, 2012 at 3:57 PM, brice gordon > wrote: Atlanta would like to bring down a Engineer and Evaluate library system, cost $1600.00 this does not include design can we proceed Brice Gordon Little Saint James USVI Phone *********************************************************** The information contained in this communication is confidential, may…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01878425.pdf
EFTA01878399
Dataset 10
2012-06-15
1p
152w
From:
Jeffrey Epstein
To:
brice gordo
To: brice gordo From: Jeffrey Epstein Sent Fri 6/15/2012 8:03:03 PM Subject Re:
Library AC
what do we get for the money? On Fri, Jun 15, 2012 at 3:57 PM, brice gordo wrote: Atlanta would like to bring down a Engineer and Evaluate library system, cost $1600.00 this does not include design can we proceed Brice Gordon Little Saint James USVI Phone *********************************************************** The information contained in this communication is confidential, may be attorney-client…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01878399.pdf
EFTA01118594
Dataset 9
2011-05-29
13p
1,377w
…pump room 4.flush door to kitchen ,double acting hinge 5.mirror door to commode.SEND TO MIRROR &wail south to info. 24" layout -FINISH BRICE COTTAGE EFTA01118598 bAedicare.gov - Medicare Eligibility Tool (General Enrollment) http://www.medicare.gov/MedicattEligibility/home.asOdest=.,. BURY DUMP NEW LIBRARY ROOF SCREW
LIBRARY AC
ALTERNATIVE TILE STEPS IN COURTYARD NEED NOSING LANDSCAPE ELECT. PATH TO LIBRARY MASTER TO MOTOR COURT(CROQUET LITES) HILLSIDE BOULDERS 3 SWITCH ON TENNIS LITES N. OF MASTER 3 palms …
https://www.justice.gov/epstein/files/DataSet%209/EFTA01118594.pdf
EFTA02009928
Dataset 10
2013-04-27
1p
83w
Subject:
Progress Photos Resend
From:
Roy Hodges
To:
jeevacation©
[email protected]
Jeffrey
[email protected]
]
…44:30 PM Subject: Progress Photos Resend Chiller 1.JPG Chiller 2.JPG Chiller Frequency Drives.JPG Completed Staff Bathroom Wall 2.JPG Completed Staff Bathroom Wall.JPG Marine Chiller Set Up.JPG Plumbing Run
Library AC
2.JPG Plumbing Run
Library AC
.JPG Seawater Pump.JPG Service Road Concrete Pad 2.JPG Service Road In Progress.JPG Service Road Progress.JPG Service Road Section Yet to Go.JPG Service Road from Main Compound.JPG View of Chiller House From…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02009928.pdf
EFTA01614784
Dataset 10
3p
222w
…you need 11:29:56 pm n 2017/09/23 Unknown Kitchen? Bedroom 5? 01:56:51 am EFTA01614785 Master bed 100 percent Kitchen 100 percent Cabana 3 the only 1 usable 03:23:06 pin Unknown Chillax? 06:04:52 pm O en No Chillax Chillax bath cabana4 no power transfomer blew i have 1 more will have it done by tue latest
library ac
back on line just finnished 08:39:53 pm 2018/01/13 Ha !! Ha !…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01614784.pdf
EFTA01793204
Dataset 10
2013-04-27
1p
45w
Subject:
Progress Photos 1
From:
Roy Hodges <EMM
To:
Jeffrey Epstein
From: Roy Hodges <EMM Sent: Saturday, April 27, 2013 6:37 PM To: Jeffrey Epstein Subject: Progress Photos 1 Attachments: Chiller 1JPG; Chiller 2JPG; Chiller Frequency DrivesJPG; Marine Chiller Set UpJPG; Plumbing Run
Library AC
2JPG; Seawater Pump.JPG; View of Chiller House From OfficeJPG EFTA_R1_00125948 EFTA01793204
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01793204.pdf
EFTA01988887
Dataset 10
2013-04-26
2p
137w
Subject:
Progress Photos
From:
Stephanie Hodges
To:
jeevacation©
[email protected]
]; Jeffrey Epsteinbeeyacation©gmail.corn]
…on your return. Best Regards, R&S Chiller 1.JPG Chiller 2.JPG Chiller Frequency Drives.JPG Completed Staff Bathroom Wall 2.JPG Completed Staff Bathroom Wall.JPG Marine Chiller Set Up.JPG Plumbing Run
Library AC
2.JPG Plumbing Run
Library AC
.JPG Seawater Pump.JPG Service Road Concrete Pad 2.JPG Service Road In Progress.JPG Service Road Progress.JPG Service Road Section Yet to Go.JPG Service Road from Main Compound.JPG View of Chiller House From…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01988887.pdf
EFTA02037299
Dataset 10
2013-04-27
2p
179w
Subject:
Re: Progress Photos
From:
Stephanie Hodges
To:
jeevacationfftmail.con[
[email protected]
]; Jeffrey Epsteinbeeyacation©grnancorn]
…on your return. Best Regards, R&S Chiller 1.JPG Chiller 2.JPG Chiller Frequency Drives.JPG Completed Staff Bathroom Wall 2.JPG Completed Staff Bathroom Wall.JPG Marine Chiller Set Up.JPG Plumbing Run
Library AC
2.JPG Plumbing Run
Library AC
.JPG Seawater Pump.JPG Service Road Concrete Pad 2.JPG Service Road In Progress.JPG Service Road Progress.JPG Service Road Section Yet to Go.JPG Service Road from Main Compound.JPG View of Chiller House From…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02037299.pdf
EFTA01112008
Dataset 9
2012-11-29
3p
573w
…for late winter early spring time. AD .Winston$357,255.00, Power Cooling $395,000.00, Pierpont $330,000.00 no electrical included. EFTA01112008 LSJ •
Library ac
unit, we received two proposals to remove and replace the existing Trane unit that is failing and had operational issues since installation. The Trane unit could never keep the relative humidity levels in the library at set point and the air flow in the library is not balanced properly. Kent Magee of ARS hired…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01112008.pdf
EFTA01058800
Dataset 9
2016-12-19
1p
349w
Subject:
LSJ
From:
brice gordon
To:
Jeffrey Epstein <
[email protected]
>
…some time Hot Water Circulating Pump - Kitchen, needs to addressed UV Water Treatment - Cabana 1, new unit ordered, again found unplugged/non operational Master Bedroom Dehumidification and Air Purification Systems disconnected, these have been replaced Sea Water Strainer for
Library AC
System, had holes in it allowing debris to get to intake pumps, this has been fixed Landscape Lighting Total mess, some issues have been addressed. All this comes under Preventive Maintenance, which clearly has not been done On our…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01058800.pdf
EFTA01146225
Dataset 9
3p
567w
…control valves AC -11, AC-4 budget $1,500.00 • Steam Room 3 rd floor change door frame to magnetic door latch with new vapor seal gaskets .Home Depot magnets installed no good and will leak. I will provide contractor and proposal. • Chiller Project for late winter early spring time. EFTA01146225 LSJ •
Library ac
unit, we received two proposals to remove and replace the existing Trane unit that is failing and had operational issues since installation. The Trane unit could…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01146225.pdf
EFTA01977455
Dataset 10
2012-10-29
2p
1,155w
…plants - Take down the ropes at the end of the month on the trees — COMPLETE 16. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17.
Library - AC
quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym NOLpgallatial - installation of the speed bag - David (carpenter) — old unit…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01977455.pdf
EFTA01976576
Dataset 10
2012-11-13
3p
1,174w
…Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10 - Sea Grape — contacted PR sourcing prices expected 11/14 - 20 x 15ft Coconut Palms — for engineering area — ordered 11/9 ETA L.5112/1 17. Roads - General re-grading of roads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment 18.
Library - AC
quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01976576.pdf
EFTA02006082
Dataset 10
2012-10-02
3p
1,181w
…MBR — completed 9/27 17. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review details with Better Roads — week of 10/1 18.
Library - AC
quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 19. New Employee Bathrooms 20. Gym - New punching bag — installation of the speed bag on hold 9/22 - per JE until visit • New front…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02006082.pdf
EFTA02026837
Dataset 10
2012-10-01
3p
1,192w
…MBR — completed 9/27 18. Roads - Priority is Gym road grading — remove sand and re-grade — COMPLETE - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review details with Betteroads 9/17 19.
Library - AC
quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 20. New Employee Bathrooms 21. Gym - New punching bag — installation of the speed bag on hold…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02026837.pdf
EFTA02029505
Dataset 10
2012-10-05
3p
1,104w
…so not to damage lines 17. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review details with Better Roads — week of 10/8 18.
Library - AC
quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 19. New Employee Bathrooms 20. Gym - New punching bag — installation of the speed bag on hold 9/22 - per JE until visit — carpenters…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02029505.pdf
EFTA02315485
Dataset 11
2012-10-01
3p
1,183w
…MBR — completed 9/27 18. Roads - Priority is Gym road grading — remove sand and re-grade — COMPLETE - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review details with Betteroads 9/17 19.
Library - AC
quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 20. New Employee Bathrooms 21. Gym - New punching bag — installation of the speed bag on hold…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02315485.pdf
EFTA02316357
Dataset 11
2012-10-02
3p
1,182w
…MBR — completed 9/27 17. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review details with Better Roads — week of 10/1 18.
Library - AC
quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 19. New Employee Bathrooms 20. Gym - New punching bag — installation of the speed bag on hold 9/22 - per JE until visit • New front…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02316357.pdf
EFTA00522081
Dataset 9
2p
1,110w
…plants - Take down the ropes at the end of the month on the trees — COMPLETE 16. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17.
Library - AC
quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - David (carpenter…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00522081.pdf
1–20 of 39 results · page 1 of 2
«
←
1
2
→
»
Corpus: 1990-03-17 – 2025-12-01
←
June 2012
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Undated
(150,429)
None
Light
Medium
Heavy
Results by Dataset
39 total
Set 9
24
Set 10
13
Set 11
2