esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
88 results for “
"Diamond Brite"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
Corpus: 1990-03-17 – 2025-12-01
←
December 2011
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Undated
(150,429)
None
Light
Medium
Heavy
EFTA00588660
Dataset 9
2011-12-06
2p
395w
…scope of work: - Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster Re-mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00588660.pdf
EFTA00587386
Dataset 9
2011-12-06
2p
394w
…scope of work: Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster Re-mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00587386.pdf
EFTA00686556
Dataset 9
2011-10-24
1p
330w
…work: Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster - Re-mud in all areas chipped out to level back up ▪ Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work - Lightly acid wash all new tile work for polishing ▪ Install all new Grey main drains and wall fittings - Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00686556.pdf
EFTA00586806
Dataset 9
2011-12-06
2p
393w
…scope of work: Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster Re-mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00586806.pdf
EFTA00586805
Dataset 9
2011-12-06
1p
257w
…and steps Acid wash and pressure wash all existing
Diamond Brite
- Re-mud in all chipped areas - Apply new
Diamond Brite
— Midnight Blue - Install new wall fittings and main drains — grey color ** Note: 7 day completion from start to finish With payments to be made as follows: S 15,000.00 off balance owed due upon signing of this agreement S 19,742.19 remaining contract balance due upon filling with water Any alteration or deviation from above specifications involving…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00586805.pdf
EFTA00656786
Dataset 9
2011-10-24
2p
382w
…scope of work: - Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster Re-mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00656786.pdf
EFTA00305797
Dataset 9
2011-12-06
2p
396w
…scope of work: - Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster Re-mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00305797.pdf
EFTA00587379
Dataset 9
2011-10-24
1p
330w
…work: Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster - Re-mud in all areas chipped out to level back up ▪ Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work - Lightly acid wash all new tile work for polishing ▪ Install all new Grey main drains and wall fittings - Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00587379.pdf
EFTA00672565
Dataset 9
2011-12-06
1p
257w
…and steps Acid wash and pressure wash all existing
Diamond Brite
▪ Re-mud in all chipped areas ▪ Apply new
Diamond Brite
— Midnight Blue Install new wall fittings and main drains — grey color ** Note: 7 day completion from start to finish With payments to be made as follows: S 15,000.00 off balance owed due upon signing of this agreement S 19,742.19 remaining contract balance due upon filling with water Any alteration or deviation from above…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00672565.pdf
EFTA00672566
Dataset 9
2011-12-06
2p
394w
…scope of work: - Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster Re•mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00672566.pdf
EFTA01099281
Dataset 9
2p
1,067w
…area again with roller. Allow Bond Kote to cure for at least 6 hours before plastering. If Bond Kote is rained on or left to sit for more than a few days it may have to be reapplied. III. MIXING Note:
Diamond Brite
is made in batches of 60 to 80 bags using natural ingredients. For this reason there will be variations in shade between batches. Batch numbers are stamped on the ends of every bag. It is therefore incumbent…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01099281.pdf
EFTA01109767
Dataset 9
2011-10-24
1p
328w
…work: Sawcut below waterline tile Chip off all waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing
Diamond Brite
plaster Re•mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work • Lightly acid wash all new tile work for polishing ▪ Install all new Grey main drains and wall fittings ▪ Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01109767.pdf
EFTA01099283
Dataset 9
5p
3,657w
…spraying with water; chlorine may
[email protected]
lines and fittings to a depth of 3/8 inch. be used as needed. Stop water penetration from outside INSTALLATION: pool. Plug cracks and leaks around MIXING: fittings using hydraulic cement (SGM
Diamond Brite
is made in batches of SURFACE PREPARATION: Dynamite Pool Patch). Etch cleaned 4,000 to 20,000Ibs (1,800 to 9,000 Examine pool surfaces to identify surface with muriatic acid solution. kg) using natural ingredients. For this…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01099283.pdf
EFTA02381918
Dataset 11
2011-10-24
1p
326w
…a scope of work: Sawcut below waterline tile Chip ofTall waterline tile Chip around all wall fittings, main drains, and below waterline tile Acid wash all existing Diamond Britc plaster Re-mud in all areas chipped out to level back up Thin set new tile to existing mortar work and
Diamond Brite
Grout all new tile work Lightly acid wash all new tile work for polishing Install all new Grey main drains and wall fittings Fill pool and LOVE IT!!…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02381918.pdf
EFTA01992962
Dataset 10
1p
196w
This is the manufactures recommended procedure for resurfacing of a
diamond brite
pool Tom recommends that we follow this procedure We have have recourse of they screw it up again Sent from my iPhone On Jan 31, 2012, at 9:57 AM, Jeffrey Epstein
[email protected]
> wrote: we specifillcaly said that the plaster was not to be resurfaced but replayed„ both gary rex and i agreed. i m not sure why you are sending me this, On Tue, Jan…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01992962.pdf
EFTA02013359
Dataset 10
2012-02-03
1p
273w
From:
BMG
To:
jeevacationepgmail.com[jeevacation©gmail.com]; Jeffrey Epsteinbeeyacation©gmail.corn]
…labor to redo the plaster is given. All of the guys were paid their daily wage so they will re-trowel for nothing. We have to pay for the new
Diamond Brite
only. We will also have to chip out the existing
Diamond Brite
. There is no profit or overhead with this cost as it is a hard cost. This is what it will cost me to come in and replaster the pool. I would like to see at least…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02013359.pdf
EFTA01740373
Dataset 10
2011-11-06
3p
498w
Subject:
Re: VI Gunite
To:
Jeffrey Epstein leevacationftmail.com>
…$15,000.00. All the labor to redo the plaster is given. All of the guys were paid their daily wage so they will re-trowel for nothing. We have to pay for the new
Diamond Brite
only. We will also have to chip out the existing
Diamond Brite
. There is no profit or overhead with this cost as it is a hard cost. This is what it will cost me to come in and replaster the pool. I would…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01740373.pdf
EFTA02031689
Dataset 10
2012-01-31
2p
453w
From:
BMG
To:
jeeyacationepgmaitcom[jeeyacation@gmaitcom]; Jeffrey Epstein[jeevacation©gmail.com]
To: jeeyacationepgmaitcom[jeeyacation@gmaitcom]; Jeffrey Epstein[jeevacation©gmail.com] From: BMG Sent Tue 1/31/2012 2:19:05 PM Subject Re: Pool refurbishment This is the manufactures recommended procedure for resurfacing of a
diamond brite
pool Tom recommends that we follow this procedure We have have recourse of they screw it up again Sent from my iPhone On Jan 31, 2012, at 9:57 AM, Jeffrey Epstein
[email protected]
> wrote: we specifillcaly said that the plaster was not to…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02031689.pdf
EFTA01845272
Dataset 10
2011-11-02
2p
320w
Subject:
FW: LSJ
From:
Gary Kemey
To:
Jeffre E tein 'eevacation mail.com
…approximately $14,000.00 - $15,000.00. All the labor to redo the plaster is given. EFTA_R1_00234272 EFTA01845272 All of the guys were paid their daily wage so they will re-trowel for nothing. We have to pay for the new
Diamond Brite
only. We will also have to chip out the existing
Diamond Brite
. There is no profit or overhead with this cost as it is a hard cost. This is what it will cost me to…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01845272.pdf
EFTA02022547
Dataset 10
2011-01-24
2p
418w
…Rectangle Gunite Pool — 4' —10' Depth 2.) 6" Waterline tile of L.S.J Choice 3.) 16" x 24" x 2" Thick Pool Coping — L.S.J. Choice of Coping 4.) 2 — LED Pool Lights 5.) 2 Sets of Steps in Pool 6.) 2 Benches in Deep End of Pool (If wanted) 7.) I — Pentair Variable Speed Pumps 8.) I — Pentair Cartridge Filters 9.) 1 — Auto Water Leveler 10.)
Diamond Brite
Interior Pool Finish L.S.J., L.L.C…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02022547.pdf
1–20 of 88 results · page 1 of 5
«
←
1
2
3
4
5
→
»
Results by Dataset
88 total
Set 9
44
Set 10
37
Set 11
7