esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
144 results for “
"Construction Documents"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
Corpus: 1990-03-17 – 2025-12-01
←
July 2015
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Undated
(150,429)
None
Light
Medium
Heavy
EFTA00634695
Dataset 9
2015-07-14
4p
1,532w
Subject:
Baha Mar claiming `deliberate sabotage' I The Tribune
From:
David Stern
To:
Jeffrey Epstein <
[email protected]
>
…maybe too late already to fix. China Construction America is subsidiary of massive Chinese State Owned Enterprise "China State Construction Engineering Corporation". If you want we can have a look if there is something to be done. http://www.tribune242.cominews/2015/jul/13/baha-mar-claiming-dehberate-sabotagei Baha Mar Claiming `Deliberate Sabotage' #By NEIL HARTNELL #Tribune Business Editor #
[email protected]
#Baha Mar has accused its main contractor of "deliberate sabotage" and the removal of key
construction documents
…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00634695.pdf
EFTA00596320
Dataset 9
2014-01-29
4p
2,576w
…graphically and/or photographically to prepare the existing floor plans, elevations and building sections. Construction Phase Services - These services will include the following: Perform periodic visits to the site during construction in order to review the progress and quality of the work for the purpose of ensuring conformity with the
Construction Documents
. This service will be billed hourly as required. The fee for the design services outlined shall be based upon o lump-sum fee of TWELVE THOUSAND DOLLARS ($12…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00596320.pdf
EFTA01194961
Dataset 9
2015-01-16
6p
3,639w
…and evaluations for contracting of the construction work. 4.2 The Contractor will provide Construction Phase Services. This Construction Administration Services by the Jaredian Design Group will include: 4.2.1 Review and approve Building Contractor Submittals. 4.2.2 Respond to the Building Contractor Requests For Information and clarification of the
Construction Documents
. 4.2.3 Perform Substantial Completion Inspections. 4.2.4 Perform Punch List Inspections. 2 I Fee Proposol tor Architectural-Engineering Services for Utile St. James…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01194961.pdf
EFTA00601451
Dataset 9
2015-01-16
6p
3,645w
…and evaluations for contracting of the construction work. 4.2 The Contractor will provide Construction Phase Services. This Construction Administration Services by the Jaredian Design Group will include: 4.2.1 Review and approve Building Contractor Submittals. 4.2.2 Respond to the Building Contractor Requests For Information and clarification of the
Construction Documents
. 4.2.3 Perform Substantial Completion Inspections. 4.2.4 Perform Punch List Inspections. 2 I Fee Proposol tor Architectural-Engineering Services for Utile St. James…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00601451.pdf
EFTA01154569
Dataset 9
2014-01-29
4p
2,565w
…graphically and/or photographically to prepare the existing floor plans, elevations and building sections. Construction Phase Services - These services will include the following: 0 Perform periodic visits to the site during construction in order to review the progress and quality of the work for the purpose of ensuring conformity with the
Construction Documents
. This service will be billed hourly as required. The fee for the design services outlined shall be based upon o lump-sum fee of TWELVE THOUSAND DOLLARS…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01154569.pdf
EFTA01202497
Dataset 9
2014-05-14
4p
2,509w
…we propose the following fee structure: Measured Drawings $12,000.00 Preliminary Design Studies and Plans $10,500.00 Final Design/
Construction Documents
$ 8,500.00 CZM and Building Permit Processing $ 2,500.00 GRAND TOTAL $33,500.00 The fee for the design services outlined shall be based upon a lump-sum fee of THIRTY-THREE THOUSAND AND FIVE HUNDRED DOLLARS ($33,500.00). i I Fee Proposol for A-E Services fa the Library and Study…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01202497.pdf
EFTA01194956
Dataset 9
2015-02-23
3p
1,308w
…and the number of drawings to be produced. The Jaredian Design Group proposes the following fee proposal for the aforementioned tasks: • Maintenance Shop Design - o Initial Payment $25,000.00 o Pre-design and Conceptual Design $ 5,000.00 o Preliminary Design Services $20,000.00 o Final Design/
Construction Documents
$20,000.00 o Bidding/Negotiations (To Be Negotiated) Total Design Fees/Maintenance Shop $70,000.00 Revised Fee Proposal for Architectural-Engineering Services for Lithe SI. James…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01194956.pdf
EFTA01195938
Dataset 9
2014-03-12
2p
422w
…expended $8,325.00 for those services thus far. We recommend the difference of $4,325.00 be reallocated to the
Construction Documents
Phase and continue to develop the Preliminary Design on an hourly basis until you feel comfortable with the overall design. At that time, we will determine if the original $6,500.00 for
Construction Documents
needs to be adjusted. Should you have any questions or comments, please feel free to call on me at 777-1600. Very…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01195938.pdf
EFTA00609970
Dataset 9
2014-05-14
4p
2,501w
…we propose the following fee structure: Measured Drawings $12,000.00 Preliminary Design Studies and Plans $10,500.00 Final Design/
Construction Documents
$ 8,500.00 CZM and Building Permit Processing $ 2,500.00 GRAND TOTAL $33,500.00 The fee for the design services outlined shall be based upon a lump-sum fee of THIRTY-THREE THOUSAND AND FIVE HUNDRED DOLLARS ($33,500.00). 1 I Fee Proposal for A-E Services fa the Library and Study…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00609970.pdf
EFTA02006232
Dataset 10
2011-07-07
1p
162w
…200972 Name I Address Project Gary Kemey Cottage 85' x 53' LSJ LLC Construction Little St. James 6100 Red Hook Qtr Suite A2-7 St. Thomas, USVI St. Thomas, USVI 00802 Project Cottage Item Description Hours Cost Total Scope of Work Using Architect Design Development Plans - Prepare
Construction Documents
for obtaining DPNR permits. Assist Owner with Permit Acquisition. Engineering Structural Design of Building with Details, prepare Floor Plans, Elevations, 1 12,000.00 12,000.00 Structural, Plumbing & Electrical Plans…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02006232.pdf
EFTA02006233
Dataset 10
0p
182w
…Address Project Gary Kemey Spa Building 72' x 44'-7' LSJ LLC Construction Little St. James 6100 Red Hook Qtr Suite A2-7 St. Thomas, USVI St. Thomas, USVI 00802 Project Spa Building Item Description Hours Cost Total Scope of Work Using Architect Design Development Plans - Prepare
Construction Documents
for obtaining DPNR permits. Assist Owner with Permit Acquisition. Engineering Structural Design of Building with Details, prepare Floor Plans, Elevations, 1 10,000.00 10,000.00 Structural, Plumbing & Electrical Plans…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02006233.pdf
EFTA00606964
Dataset 9
1p
163w
…712011 200972 Name /Address Project Gary Kerney Cottage 85' x 53' LSJ LLC Construction Little St. James 6100 Red Hook Qtr Suite A2-7 St. Thomas, USVI St. Thomas, USVI 00802 Project Cottage Item Description Hours Cost Total Scope of Work Using Architect Design Development Plans - Prepare
Construction Documents
for obtaining DPNR permits. Assist Owner with Permit Acquisition. Engineering Structural Design of Building with Details, prepare Floor Plans, Elevations, 1 12,000.00 12,000.00 Structural, Plumbing & Electrical Plans…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00606964.pdf
EFTA00609706
Dataset 9
14p
4,817w
…Monthly services shall be billed on a percentage of completion basis. 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: twenty percent (20%) Design Development Phase: thirty percent (20%)
Construction Documents
Phase: thirty percent (40%) Bidding/Negotiation Phase: five percent (05%) Site Observation Phase: fifteen percent (15%) Total Basic Compensation one hundred percent (100%) 11.3 COMPENSATION FOR ADDITIONAL SERVICES 11.3.1 FOR…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00609706.pdf
EFTA00304770
Dataset 9
1p
501w
…renovation. * 30 Park Avenue Lobby, NY Renovation - Designed and created
Construction Documents
for Lobby, Fitness Room and Residential Elevator Lobbies for all floors. * Westin Hotel, Ottawa, Canada, Public Spaces - Contributed Design and FF & E selection for lobby area. * Marketing, Booking/Staging Photo Shoots & Website Design. THE OFFICE OF THIERRY DESPONT New York New York August 2006 - Juty.2007 INTERIORDESIGN CONSULTANT * The Lamb's Club Hotel, NY Renovation - Contributed full Design services; Schematic and
Construction Documents
; Presentations and Spec Books. DESIGN…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00304770.pdf
EFTA00589844
Dataset 9
1p
164w
…ST. THOMAS, VIRGIN ISLANDS Term Amount of Amounts DESCRIPTION Balance Amounts this Billing Previously Billed Initial Payment/Pre-Design and Conceptual Design $30.000.00 $0.00 $30,000.00 $0.00 Preliminary Design Services $20,000.00 $15,000.00 $0.00 $5,000.00 Final Design/
Construction Documents
$20.000.00 $0.00 $0.00 $20,000.00 Bidding/Negotiations. Construction Admin. Services $5,000.00 $0.00 $0.00 $5,000.00 TOTALS $75,000.00 $15…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00589844.pdf
EFTA00613672
Dataset 9
14p
4,760w
… on fl i lly h u m c o m EFTA00613681 11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: Schematic Design Phase: twenty percent (20%) Design Development Phase: thirty percent (20%)
Construction Documents
Phase: thirty percent (40%) Bidding/Negotiation Phase: five percent (05%) Site Observation Phase: fifteen percent (15%) Total Basic Compensation one hundred percent (100%) 11.3 COMPENSATION FOR ADDITIONAL SERVICES 11.3.1 FOR…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00613672.pdf
EFTA01198346
Dataset 9
2008-12-11
9p
3,097w
…develop an early LSP while holding subcontractors accountable for a complete scope of work based upon incomplete documents. b. Provide a detailed list of the documentation required from the A/E to ensure a meaningful LSP that the proposer will endorse. Indicate o recommendation as to the percentage of contingency that you would recommend be carried for completion of the
construction documents
. EFTA01198352 REQUEST FOR QUALIFICATIONS THE NEW VIRGIN ISLANDS EMERGENCY MANAGE MENT AGENCY HEADQUARTERS, ST. THOMAS Page 5 4…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01198346.pdf
EFTA01121704
Dataset 9
2011-07-07
1p
179w
…Address Project Gary Kerney Spa Building 721 x 44'-7" LSJ LLC Construction Little St. James 6100 Red Hook Qtr Suite A2-7 St. Thomas, USVI St. Thomas, USVI 00802 Project Spa Building Item Description Hours Cost Total Scope of Work Using Architect Design Development Plans - Prepare
Construction Documents
for obtaining DPNR permits. Assist Owner with Permit Acquisition. Engineering Structural Design of Building with Details, prepare Floor Plans, Elevations, 1 10,000.00 10,000.00 Structural, Plumbing & Electrical Plans…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01121704.pdf
EFTA00727160
Dataset 9
2010-08-18
1p
328w
…based on Client's new design direction. (Once conceptual diagrams arc approved, Gensler will provide separate proposal to create new Permit/
Construction Documents
, include required Consultants.) Description: Screening Room: Convert Existing Living Room into "Residential-Style" Screening Room. • No separate projection booth. • Fixed Screen. • Limited step seating if any. 2500 Broadway 405.7112.000\documentation11_general\ lwa wa 002 100818 wal 100708 redesign services.docx Suitt 300 Sow Menace California 90404 310.449.5600 WA0211I0 FAX: 310.449.5850 EFTA00727160
https://www.justice.gov/epstein/files/DataSet%209/EFTA00727160.pdf
EFTA00788403
Dataset 9
1p
193w
…ST. THOMAS, VIRGIN ISLANDS Term Amount of Amounts DESCRIPTION Balance Amounts this Ming Previously Billed Initial Payment/Pre-Design and Conceptual Design $30,000.00 $0.00 $30,000.00 $0.00 Preliminary Design Services $20,000.00 $15,000.00 $0.00 $5,000.00 Final Design/
Construction Documents
$20,000.00 $0.00 $0.00 $20,000.00 Bidding/Negotiations, Construction Admin. Services $5,000.00 $0.00 $0.00 $5,000.00 TOTALS $75,000.00 $15…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00788403.pdf
1–20 of 144 results · page 1 of 8
«
←
1
2
…
8
→
»
Results by Dataset
144 total
Set 9
108
Set 10
18
Set 11
18