esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
15 results for “
"Complete Dock"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
EFTA00583108
Dataset 9
2p
251w
…closet door -
Complete Dock
Boxes at Pools Replace hinges and Rams on both - need to review Pool Cabana Install self closing hinges on toilet door - Complete Shutters Main Compound Adjust 6 hurricane hooks - Complete Add 15 mini exterior hooks - Complete Adjust eyehooks bedroom 4 entrance - Complete Beach Office Weather Proof, Replace Rotten Stair - in progress Installation of New AC and Housing Enclose existing fiber feed and switch Complete Hurricane Bars Fabric shelf for Hurricane Bars -
Complete Dock
Carpet Replace existing…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00583108.pdf
EFTA00584500
Dataset 9
2p
221w
…closet door -
Complete Dock
Boxes at Pools Replace hinges and Rams on both - need to review Pool Cabana Install self closing hinges on toilet door - Complete Shutters Main Compound Adjust 6 hurricane hooks - Complete Add 15 mini exterior hooks - Complete Adjust eyehooks bedroom 4 entrance - Complete Beach Office Weather Proof, Replace Rotten Stair - in progress Installation of New AC and Housing Enclose existing fiber feed and switch - Complete Hurricane Bars Fabric shelf for Hurricane Bars -
Complete Dock
Carpet Replace existing…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00584500.pdf
EFTA00583048
Dataset 9
3p
1,666w
…Danny discovered the pressure equalizer tank was not pressurized — he pressurized and adjusted — COMPLETE 10. Floating Dock - Jet ski bumpers —ordered — presently on backorder — Overton will email Carlos when they are shipped out - Table/Dock Box - Dock box handles -
COMPLETE - Dock
box top to be resurfaced - Dock floors — staining needs completion — COMPLETE - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details - Wooden Bumpers — to cover concrete stripping — COMPLETE - Painting — Railing, Cross Brackets & Robe Hooks - COMPLETE 11…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00583048.pdf
EFTA00584522
Dataset 9
3p
1,413w
…Danny discovered the pressure equalizer tank was not pressurized — he pressurized and adjusted — COMPLETE 10. Floating Dock - Jet ski bumpers -ordered - presently on backorder - Overton will email Carlos when they are shipped out - Table/Dock Box - Dock box handles -
COMPLETE - Dock
box top to be resurfaced - Dock floors — staining needs completion — COMPLETE - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details - Wooden Bumpers — to cover concrete stripping — COMPLETE - Painting — Railing, Cross Brackets & Robe Hooks - COMPLETE 11…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00584522.pdf
EFTA02007830
Dataset 10
2012-07-27
3p
1,413w
…Danny discovered the pressure equalizer tank was not pressurized — he pressurized and adjusted — COMPLETE 10. Floating Dock - Jet ski bumpers —ordered — presently on backorder — Overton will email Carlos when they are shipped out - Table/Dock Box - Dock box handles -
COMPLETE - Dock
box top to be resurfaced - Dock floors — staining needs completion — COMPLETE - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details - Wooden Bumpers — to cover concrete stripping — COMPLETE - Painting — Railing, Cross Brackets & Robe Hooks - COMPLETE 11…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02007830.pdf
EFTA01912420
Dataset 10
2014-08-08
2p
256w
From:
Ann Rodriquez
To:
Jeffrey EMeevacationagmail.comj
… Everything is going good :) It's just been a lot of clean-up and re-planting this week from the Storm. Carlos said that were supposed to have a lot of rain on Sunday, Monday and Tuesday. Tomorrows schedule... Landscapers: Hydro seeding & fertilizing spraying tomorrow. Pokey and Hernando:
Complete Dock
. Danny V. & E.: Finish New Septic tank. Carlos, Guy & Kamoy: Cleaning out each Department. Bosco & Tap: Barge oil change & Maintenance. Gerry: Paint cafeteria American flag bike scat covers will be…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01912420.pdf
EFTA02008956
Dataset 10
2014-08-08
2p
257w
From:
Ann Rodriquez
To:
jeevacation©gmail.comBeevacation©gmail.comj: Jeffrey Elleevacationggmail.comj
… Everything is going good :) It's just been a lot of clean-up and re-planting this week from the Storm. Carlos said that were supposed to have a lot of rain on Sunday, Monday and Tuesday. Tomorrows schedule... Landscapers: Hydro seeding & fertilizing spraying tomorrow. Pokey and Hernando:
Complete Dock
. Danny V. & E.: Finish New Septic tank. Carlos, Guy & Kamoy: Cleaning out each Department. Bosco & Tap: Barge oil change & Maintenance. Gerry: Paint cafeteria American flag bike scat covers will be…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02008956.pdf
EFTA00577493
Dataset 9
2003-11-28
14p
2,874w
ESTATE PROGRESS REPORT — November 28, 2003 LSJ NEXT DATE REVISED LOCATION COMMENT ACTION BY BY DATE DOCK Floating Platform and Additional 2 steps per JE design have been added.
Complete Dock
GYM Cement outside Tile to be installed outside gym to increase cement. JE to On Hold supply drawing of area in order to start project. Per JE, on hold. Dip and Chin Approved - Standing Body Masters. Ordered & expected in Machine Miami by Dec 8 — then to ship to LSJ…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00577493.pdf
EFTA00994698
Dataset 9
2014-08-08
1p
256w
Subject:
Re: Pokey & Island
From:
Ann Rodriquez
To:
"Jeffrey E." <
[email protected]
>
… Everything is going good :) It's just been a lot of clean-up and re-planting this week from the Storm. Carlos said that were supposed to have a lot of rain on Sunday, Monday and Tuesday. Tomorrows schedule... Landscapers: Hydro seeding & fertilizing spraying tomorrow. Pokey and Hernando:
Complete Dock
. Danny V. & E.: Finish New Septic tank. Carlos, Guy & Kamoy: Cleaning out each Department. Bosco & Tap: Barge oil change & Maintenance. Gerry: Paint cafeteria American flag bike seat covers will be…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00994698.pdf
EFTA00577479
Dataset 9
2003-11-28
14p
2,261w
…proposal to remove pink room from main Cassidy house unit & put on a separate unit so that each guest room has their own unit. To be done during construction phase. Cassidy has replaced the air ventilator grills in MBR to reduce Complete excess noise. Painting Approved - Dock has been sanded & varnished on Nov 21, dry by
Complete Dock
Nov 23. JE to view 1999 Merc 5600 5600 mechanical work is complete. Currently being worked on 11/24 11/26 cosmetically…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00577479.pdf
EFTA00577845
Dataset 9
2003-11-28
15p
2,475w
…how to proceed. Air Conditioning Approved - Cassidy proposal to remove pink room from main Cassidy house unit & put on a separate unit so that each guest room has their own unit. To be done during construction phase. Cassidy has replaced the air ventilator grills in MBR to reduce Complete excess noise. Painting Approved - Dock has been sanded & varnished on Nov 21, dry by
Complete Dock
Nov 23. JE to view 8 EFTA00577852 ESTATE PROGRESS REPORT — November 28, 2003 LOCATION COMMENT …
https://www.justice.gov/epstein/files/DataSet%209/EFTA00577845.pdf
EFTA00577464
Dataset 9
2003-11-28
15p
2,471w
…how to proceed. Air Conditioning Approved - Cassidy proposal to remove pink room from main Cassidy house unit & put on a separate unit so that each guest room has their own unit. To be done during construction phase. Cassidy has replaced the air ventilator grills in MBR to reduce Complete excess noise. Painting Approved - Dock has been sanded & varnished on Nov 21, dry by
Complete Dock
Nov 23. JE to view 8 EFTA00577471 ESTATE PROGRESS REPORT — November 28, 2003 LOCATION COMMENT …
https://www.justice.gov/epstein/files/DataSet%209/EFTA00577464.pdf
EFTA00258807
Dataset 9
2014-04-28
100p
7,927w
…tion Status Date Carpentry Flagpole Pool Repair Dock Boxes. 11/17/2014 90% Re-Thatch main dock sheds. Ordered more thatch on Carpentry Main Dock Sheds 50% 11/13/2014 should arrive at Tropical FL on
Complete Dock
at AYH with plastic lumber around each 1.5.1 Carpentry AYH Slip. Plastic Lumber to be picked up from Tropical on 60% 11/17/2014 , Carpentry Kite House Install Door slower to Kite House. 11/13/2014 100% Carpentry Master Bath…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00258807.pdf
EFTA01062627
Dataset 9
2016-11-07
2p
331w
Subject:
Fwd: gsj civil/survey dock drawings
From:
Richard Kahn
To:
"Jeffrey E." <
[email protected]
>
…addressed herein. From: Date: Monday, November 7, 2016 at 11:58 AM EFTA01062627 To: Erika Kellerhals Cc: "Erika A. Kellerhals PC" < Subject: gsj civil/survey dock drawings good morning erika - hope you are doing well ! i have attached our latest invoice for the 75%
complete dock
drawings for the czm submission. the drawings are finished,and waiting review from amy. thanks, and give me a call if you have any questions ... have a great day ! Jeff ;1] Jeffrey Bateman…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01062627.pdf
EFTA01309317
Dataset 10
2014-11-06
23p
2,355w
…Pool O Pokey & Hernando Repair Dock Boxes. 11/17/2014 90% 2 Re-Thatch main dock sheds. Ordered more thatch on O Carpentry Main Dock Sheds Pokey & Hernando 11/13/2014 should arrive at Tropical FL on 50%
Complete Dock
at AYH with plastic lumber around each LSJ Carpentry AYH Pokey & Hernando Slip. Plastic Lumber to be picked up from Tropical on 60% 11/17/2014 Carpentry Kite House Pokey & Hernando Install Door slower to Kite House. 11/13/2014…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01309317.pdf
Corpus: 1990-03-17 – 2025-12-01
←
December 2025
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Undated
(150,429)
None
Light
Medium
Heavy
Results by Dataset
15 total
Set 9
11
Set 10
4