esc
Search documents
go
Browse entities
go
Corpus stats
go
About the data
go
AI settings
go
EFTA
Search
Search
Entities
About
Stats
Settings
⌘K
search
Search
Search syntax help
Dataset
Set 1
Set 2
Set 3
Set 4
Set 5
Set 6
Set 7
Set 8
Set 9
Set 10
Set 11
Set 12
Sort
Relevance
Most pages
Most words
Dataset
Newest
Oldest
Status
All
Extracted
Failed
DOJ Status
All
Removed
Available
Modified
Date Range
Undated only
–
Email Headers
Page Count
–
Saved Searches
+
70 results for “
"BMS"
”
Export
Keyboard Shortcuts
/
Focus search
Esc
Blur input
O
Open PDF
←
→
Paginate
Corpus: 1990-03-17 – 2025-12-01
←
January 2017
→
Mo
Tu
We
Th
Fr
Sa
Su
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Undated
(150,429)
None
Light
Medium
Heavy
EFTA02664788
Dataset 11
2017-01-02
1p
90w
Subject:
BMS
is down
From:
Merwin Dela cruz
To:
jeffrey E.
From: Merwin Dela cruz Sent: Monday, January 2, 2017 4:43 PM To: jeffrey E. Cc: Richard Kahn Subject:
BMS
is down Hi sir, I'm sorry to tell you that our
BMS
system that controls the chillers and pum=s are down. I was in contact with Siemens and waiting for their call. I'm so sorry.... Merwin Dela Cruz <?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02664788.pdf
EFTA02665320
Dataset 11
2017-01-02
2p
129w
Subject:
Re:
BMS
is down
From:
Merwin Dela cruz
To:
Jeffrey E.
From: Merwin Dela cruz Sent: Monday, January 2, 2017 8:50 PM To: Jeffrey E. Cc: Richard Kahn Subject: Re:
BMS
is down Hi sir, Chiller is back up and running... =br> Panel is up and running now. We los= back up battery where panel is connected to that made the panel lose all t=e programming. Merwin Dela Cruz On Jan 2, 2017, at 2:02 PM, Richard Kah= <
[email protected]
<mailto:
[email protected]
> =gt; wrote: any updates…
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02665320.pdf
EFTA00901881
Dataset 9
2011-01-13
1p
288w
Subject:
Fwd: Leak repair at Zorro &
BMS
Monitiring System
From:
Jeffrey Epstein <
[email protected]
>
To:
Brice Gordon
From: Jeffrey Epstein <
[email protected]
> To: Brice Gordon Subject: Fwd: Leak repair at Zorro &
BMS
Monitiring System Date: Thu, 13 Jan 2011 16:51:36 +0000 Forwarded message From: Richard Barnett Date: Thu, Jan 13, 2011 at 11:47 AM Subject: Leak repair at Zorro &
BMS
Monitiring System To: darrenindike c' , jeffrey Epstein
[email protected]
> Mr. Epstein & Darren The leak repair at Zorro is complete the plumber fixed the problem last night. I also had Monolito put the…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00901881.pdf
EFTA02020798
Dataset 10
2011-09-23
1p
187w
Subject:
RE: Siemens
…panels are 100 % complete tested all system operations ,all of the contracted SCU work is complete . The only work left is the off site connection with apogee go , to control the
BMS
over the static ip address. We also found a problem with the Catering Kitchen exhaust fan which we will need to up grade the VFD drive to resolve operational problems from the range hood . I had siemens look at the system specifications to give a price for replacement…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02020798.pdf
EFTA01124817
Dataset 9
2012-02-06
3p
886w
…11, 12A, 12B, 12C, and 12D1. Checked mechanical operation of all heat pumps for
BMS
set point control, reheat valve operation, compressor heating and cooling cycling, humidification control. The following is a list of all operational problems that ECI punch listed on a previous visit and that I also confirmed on my operational evaluation. I also labeled all heat pump units with room names and also identified all multi-zoned reheat coil room locations and humidifier supply room locations. The…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124817.pdf
EFTA00583542
Dataset 9
2013-07-01
2p
535w
…roof level .1 will call in Herbert Rose Water proof contractor to investigate what is causing this to happen .(only happens when very hot day & heavy rain comes down) . • 7/1 contacted Siemens I need to bring in programmer to check ABB exhaust fan drive for 1" floor kitchen new unit not working off wall switch due to programming issue in SCU control panel. • 7/2 Merwin working training him on building operation turning equipment on from the
BMS
system…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00583542.pdf
EFTA00595145
Dataset 9
1p
231w
…RANCH ALBUQUERQUE, NM 87108 Telephone 450-3654 Tax N'1 1-C REQUESTED Terms PREPAY Est DeL Date 10-12 WKS Ship Via OUR TRUCK Unit Type Finish Code/Screen Code Glaze Code AP- Awning Picture MI -Double Hung WkI- inite CL- Clay LH- Chrome I - Insulated AW- Awning DP- Dont& I lung Picture HZ- Bronze U- Carthame AB- Antique
Bms
2- Low-E. CA- COACIMill Angle Bay DS- Direct Set CS- Clear Stock OM- Olive Moss S. Smart-Rik…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00595145.pdf
EFTA00635242
Dataset 9
2017-01-26
3p
529w
Subject:
Fwd: GSJ solar battery update
From:
Richard Kahn
To:
"Jeffrey E." <
[email protected]
>
…Aquion had been telling us their Battery Management System(
BMS
) was not capable of causing our issues. After a series of final tests our technician, Jason Mazzone, was able to reprogram the inverters to bypass the
BMS
while still operating within the Aquion charging and discharging window. All batteries are up and running and today will be the ultimate test if the batteries made it through the night. Since the
BMS
is no longer limiting the SMA inverters charging pattern…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00635242.pdf
EFTA01083536
Dataset 9
24p
3,145w
…or copying of this document or any part thereof is strictly prohibited and may be unlawful. 0 2013 Jeffrey Epstein — All rights reserved" EFTA01083537 Maintenance Systems The residence has extensive mechanical and electrical equipment such as ventilation, lighting, power systems, fire systems, and security systems, which are controlled and monitored by the residence's
BMS
- Building Maintenance System. These systems are to be maintained as required to insure the highest standards are achieved. Each zone has Daily, Weekly, Six Month…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01083536.pdf
EFTA01092129
Dataset 9
1p
414w
…3 compressors. As outdoor temperature increases, during hot summer weather, the fourth compressor will be used at times. Under extreme conditions temperatures from 95 degrees and above, the 4O ton carrier must be started, through the
BMS
system. This 40 ton chiller is approximately 25 years old, and has very poor efficiency rating — approximately 2 KW per ton or higher. By removing this inefficient chiller, and adding a new 30 ton multi stack module, to the existing multi stack, you…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01092129.pdf
EFTA01853151
Dataset 10
2011-10-11
4p
386w
Subject:
RE: ABB Drives
From:
Richard Bamett
To:
rich
…From: Richard Barnett [mailto: Sent: Friday, October 07, 2011 To: Subject: ABB Drives Mike attached is the specifications for the Kitchen Exhaust fan in pictures please give me price to replace the 20 yr old drive. The motor is 3hp Rpm 1750 drive needs to work from
BMS
and wall switch in kitchen. Also need a price on separate proposal for heating pump in basement acs141-141-2k7-1 2 hp 200v-240v.Thanks Richard Barnett EFTA_R1_00248541 EFTA01853154
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01853151.pdf
EFTA02008884
Dataset 10
2011-10-04
2p
473w
Subject:
FW: Siemens upgrade
From:
Richard Bamett
To:
jeevacation©gmail.comfjeeyacation©gmail.comj: Jeffrey Epsteinheeyacationsfpgmail.coml
…time, the project is completed with regards to the upgrades of the SCUs, DPUS and MEC, as well as the installation of the new Insight software. All the panels are currently communicating through the
BMS
. However, there was another application which was being utilized by yourself in order to monitor the entire household remotely that requires a more advanced operating system. The name of the application is APOGEE GO. the new APOGEE GO works only in the following windows platform…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02008884.pdf
EFTA01853326
Dataset 10
2011-10-11
4p
519w
Subject:
RE: ABB Drives
From:
Jeffrey Epstein
To:
Richard Bamett
…EFTA01853328 From: Richard Barnett [main() Sent: Frida October 07 2011 2:07 PM To Subject: ABB Drives Mike attached is the specifications for the Kitchen Exhaust fan in pictures please give me price to replace the 20 yr old drive. The motor is Shp Rpm 1750 drive needs to work from
BMS
and wall switch in kitchen. Also need a price on separate proposal for heating pump in basement acs141-141-2k7-I 2 hp 200v-240v.Thanks Richard Barnett *********************…
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01853326.pdf
EFTA00621939
Dataset 9
2010-12-09
3p
3,654w
…Days Project Proposal Level 3 Energy Audit Proposal Siemens Industry, Inc. will provide an ASHRAE Level 3 Energy Audit Report for the building at 9 East 71ST Street. This audit will be used to determine the most financially viable energy improvements at the site. and the cost to implement each improvement. Major points of the audit will include: 1. Metering (Electric and steam) and integration into the
BMS
. 2. Retro-commissioning of: a. Cooling System (chillers, towers, pumps, coils) b…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00621939.pdf
EFTA00921410
Dataset 9
2011-10-10
2p
586w
Subject:
Fwd: FW: Siemens upgrade
From:
Jeffrey Epstein <
[email protected]
>
To:
Richard Kahn
…Siemens upgrade Rich At this time, the project is completed with regards to the upgrades of the SCUs, DPUS and MEC, as well as the installation of the new Insight software. All the panels are currently communicating through the
BMS
. However, there was another application which was being utilized by yourself in order to monitor the entire household remotely that requires a more advanced operating system. The name of the application is APOGEE GO. the new APOGEE GO works only…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00921410.pdf
EFTA00127743
Dataset 9
2019-01-27
65p
26,235w
…a Building Management to drop below the BOP target of 68 degrees before, System (
BMS
), which would continuously monitor during, and after the power outage. building temperatures and heating and cooling equipment functionality. Additionally, a
BMS
would We found that MDC Brooklyn and BOP management allow facilities staff to make corrective adjustments took steps to ensure the safety and security of the more quickly. Absent a
BMS
, we found that facilities facility during the power outage but failed to effectively…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00127743.pdf
EFTA00709290
Dataset 9
2010-12-08
1p
523w
Subject:
Energy Management Plan For 9 East 71st Street
From:
Richard Barnett <
To:
harry belle < >, rich kahn < >,
…and operates all the functions of the HVAC system at the property. On that day I had a meeting with Bradley Rickert account executive and Stephen Driver Senior energy engineer we discussed system mechanical up grades control
BMS
upgrades and automated systems to control demand and the reduction of consumption. I am currently waiting on up grade proposals and a comprehensive Energy Assessment proposal from their energy engineer. We had also a phone conference that day with Harry Bella explaining…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00709290.pdf
EFTA00899293
Dataset 9
2010-12-08
2p
620w
Subject:
Re: Energy Management Plan For 9 East 71st Street
From:
Jeffrey Epstein <
[email protected]
>
To:
Richard Barnett
…technology company that designed the computer control Building management system that controls and operates all the functions of the HVAC system at the property. On that day I had a meeting with Bradley Rickert account executive and Stephen Driver Senior energy engineer we discussed system mechanical up grades control
BMS
upgrades and automated systems to control demand and the reduction of consumption. I am currently waiting on up grade proposals and a comprehensive Energy Assessment proposal from their energy engineer…
https://www.justice.gov/epstein/files/DataSet%209/EFTA00899293.pdf
EFTA01124813
Dataset 9
2013-11-22
2p
636w
…proposed repairs in progress with Trane Corporation and ECI Controls. I also worked in conjunction with Brice Gordon and performed system wide operational checks of all of the heat pump units. The operational checks included heating and cooling compressor cycle operation, primary heating and secondary heating sequencing through ECI control program on the
BMS
system. Mechanical checks of all heating reheat coils and Belimo of valve actuators (for reheat control valves). Operational checks of all main system loops, cooling towers…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124813.pdf
EFTA01071792
Dataset 9
2010-12-09
3p
3,654w
…Days Project Proposal Level 3 Energy Audit Proposal Siemens Industry, Inc. will provide an ASHRAE Level 3 Energy Audit Report for the building at 9 East 71ST Street. This audit will be used to determine the most financially viable energy improvements at the site. and the cost to implement each improvement. Major points of the audit will include: 1. Metering (Electric and steam) and integration into the
BMS
. 2. Retro-commissioning of: a. Cooling System (chillers, towers, pumps, coils) b…
https://www.justice.gov/epstein/files/DataSet%209/EFTA01071792.pdf
1–20 of 70 results · page 1 of 4
«
←
1
2
3
4
→
»
Results by Dataset
70 total
Set 7
1
Set 8
1
Set 9
50
Set 10
13
Set 11
5