: • (2) Riser pole Fault Interrupters • (2) Primary Pad-mount Meters • (2) S&C Switches (Automatic Operation and Isolation) I recommend the automatic option as this option is much more reliable than the manual option. This will offer more flexibility for outages on one of the two distribution circuits connected to the LSJ/GSJ distribution network as designed…