Design Development - Pool
Schematic Design - Consultants
Gensler
Payment Analysis - 07/11/2007 - 03/01/2011
Type Date Num Memo Account Clr Split Amount
Schematic Design - Consultants - Existing Main Residence 5,000.00
• L.S.J.• LLC -50,000.00
Check
LLC -50.000.00
Check 64/01/2009
Construction Design -Spa Concept Design
10/6/2009 Development Design - Consultants - Pool 51,000.00
6/16/2010 Design Development - Consultants - ATV Garage
6/16/2010 Design Development - Consultants - Pool I 22,625.00
LLC -8,940.00
Check 12/02/2010 Wire 5inv
4/1/2009 Design Development - Pool 30,000.00
6/16/2010 Construction Design - Pool