AEI Development, L.L.C.
Architectural MilIntirk • High End Cabinetry
8168 Crown Bay Marina STE, 310- VI 00802
PM (340) 779 8090 Cell
Fax# 1-800-886 659 QUOTE
Date: 05/23/2012
To: Bill Adams No: Q120523-3
Framing material Proud Member of
Project:
From: Ismail I: milli
CMA
Cabinet lAtikere Aeeociatinr
Item qty description each total
1 68' 2" x 7" Mahogany lumber material 950.00
2 1 Labor to make it profile per sketch 3,000.00
3 1 Delivery to Red Hook Dock 50.00
Total: 4,000.00
NOTES:
• Delivery is included. Installation by others.
• Sanded ready tofinish. Finishing is not included.
• Approximately 3 weeks lead time after receipt 50% deposit.
• This quote goodfor 30 days.
EFTA_R1_02060153
EFTA02698859
AI Analysis
Summarize this document or ask questions about its contents using Claude.
Typical cost: less than $0.01 per query with Haiku. Model can be changed in Settings.