Subject: Barge Ramp Heavy Materials Concrete
Good Afternoon,
After letting EB know a=out the open slots with HM we have got them on the schedule for this Frida= at 730 am to pour
the ramp. This will be a 17 yard pour so two truc=s.
Very Respectfully,
Ky=e