From: Brice Gordon ‹ >
To: "jeffrey E." <jeevacationggmail.com>
Cc: Rich Kahn Zorro Ranch
Subject: ZM Water Development Update
Date: Fri, 17 Nov 2017 16:47:07 +0000
Attachments: ZM_Irrigation_Pondintake_Screen.JPG; ZM_Irrigation_Pondintake_Screen_2.JPG;
ZM_lrrigation_Pond3.JPG
Good Morning
Attached photos for your reference:
1. On Site Fabrication & Installation of an Intake Screen for the Water coming from the Pond to the
Distribution Pumps has been completed
2. Upon JCH's recommendation a Waterfall has been Constructed at the Prevailing Wind Corner of
the Pond. This will assist in the Aeration of the Water. There maybe a need for Floating Solar
Powered Sprinklers in the future.
3. Compaction of Pond Sides & Base will be completed by the end of the week, this
obviously help with Water Retention
4. Engineering & Design (JCH) of New Pump Skid & Distribution of Water from the Pond to
the PBU (20 acres) is in process. Proposal will be forwarded once received
5. Filling of the Irrigation Pond will commence next week & will continue during the Winter.
Transducer readings will be taken weekly to monitor water production vs demand.
6. The next stage is to Engineer a Solution to Irrigate the 20 acres under the permit with
the less amount of expenditure, but meeting the requirements of the OSE.
Regards Brice
Stanley, NM
EFTA00952073
AI Analysis
Summarize this document or ask questions about its contents using Claude.
Typical cost: less than $0.01 per query with Haiku. Model can be changed in Settings.